MHG Gassero boilers supplied to Bloomsbury Plaza

Published:  04 October, 2017

MHG Gassero Wallcon boilers, along with MHG hot water cylinders, have been supplied to Bloomsbury Plaza in central London, which is undergoing a major refurbishment. An MHG pressure manager and vessel were also supplied as part of the package.

Located on the corner of Bloomsbury Street and New Oxford Street, Bloomsbury Plaza comprises ground level retail units with offices above and basement car parking. The extensive refurbishment project includes replacement of all plant and engineering services.

Specified by ITD Consultants and installed by the Special Projects Division of Briggs and Forrester, the two 115kW Gassero Wallcon boilers were supplied complete with wall-mounting frames, along with two hot water cylinders which are serving two separate zones within the building. As the plant room is on the roof the boilers, frame and associated pipework were delivered in component parts for assembly on site.

MHG Gassero Wallcon 115kW wall-mounted gas-fired condensing boilers feature low NOx (Class 5) performance and incorporate a fully modulating pre-mix burner with 4:1 turndown capability. They can be supplied with matched mounting frames and cascade hydraulics including low loss headers or matched system separation plate heat exchangers.

For more information on this story, click here: October 2017, 123

comments powered by Disqus

Search

Welcome

Welcome to Modern Building Services Online, the web edition of Modern Building Services (MBS) journal and the UK's most popular Building Services engineering site. Modern Building Services covers the entire Building Services Engineering industry. This site contains archived content from the journal, plus web-specific content.

When you go to our digital edition, you can also access the archive of digital editions.
June 2018: DIGITAL EDITION

ARCHIVE OF DIGITAL EDITIONS

Modern Building services has a group
on Linkedin - join us!

Jobs

  • Energy and sustainability: Performance and analysis manager

     An exciting opportunity will arise shortly for an exceptional person with extensive experience of managing sustainability within large complex organisations. Can you demonstrate extensive experience of energy management, proven ability to drive program......

more jobs »

Poll

"Is the Building Services industry lagging behind in the implementation of BIM?"



Calendar