Powered smoke extraction reduces installation costs for new London hotel

Published:  13 January, 2007

colt
The benefits of Coltís Shaft system for extracting smoke from buildings have been exploited in the Hoxton Hotel in the City of London.

The cost of providing fire safety in a new London business hotel has been reduced using a powered smoke-extraction system.

The £17 million Hoxton Hotel in the City is the first contract for which Coltís Shaft fan-powered system has been specified. It reduces the size of shaft required by 80% compared with a conventional BRE shaft using natural ventilation. The Colt Shaft requires 0.6 m2, compared with 3 m2 for the BRE shaft.

The project involved Colt supplying, installing, wiring and commissioning its Shaft for this 205-bedroom, 7-storey hotel. The Shaft runs vertically through the hotel and, in the event of a fire, would use a fan system to draw smoke away from the fire-fighting core. The system was been approved for this application following tests witnessed at a demonstration rig at Coltís premises in Havant.

The Colt Shaft uses pressure sensors and a variable-speed fan to prevent high negative pressures in the lobby making it difficult to open doors and drawing smoke from the fire compartment into the lobby.

The consulting engineer was Building Services Design of Monmouth and the contractor was Derry Building Services of Newark.



comments powered by Disqus

Search

Welcome

Welcome to Modern Building Services Online, the web edition of Modern Building Services (MBS) journal and the UK's most popular Building Services engineering site. Modern Building Services covers the entire Building Services Engineering industry. This site contains archived content from the journal, plus web-specific content.

When you go to our digital edition, you can also access the archive of digital editions.
June 2017: DIGITAL EDITION
ARCHIVE OF DIGITAL EDITIONS

Modern Building services has a group
on Linkedin - join us!

Construction Week

Jobs

  • Lead Mechanical & Electrical Engineer

    †Do you want to make a real difference? A unique opportunity has arisen for an established Lead Mechanical and Electrical Engineer to work in the Buildings and Construction group, the in house multidisciplinary design practice at Dorset County Council .........

more jobs »

Poll

"Is the Building Services industry lagging behind in the implementation of BIM?"



Calendar