Boiler controllers gives weather compensation for three circuits

Published:  18 May, 2009

controller
This stand-alone boiler controller can provide independent weather compensation to three separate heating circuits.



Kanmor’s 374e stand-alone universal heating controller can control two boilers and provide independent weather compensation to three separate circuits. It is available in the UK from Radiant Control.

For example, at an ambient of -3°C it can deliver water to radiators at 75°C, at 60°C for a timber joisted underfloor heating circuit and at 50°C for screeded underfloor heating. At higher outdoor temperatures, the supply temperature to each circuit is reduced in line with its characteristic curve.

Temperature control of such circuits is achieved by modulating two mixing valves with three or four ports, depending on the system design.

If one of two controlled boilers fails to bring the water temperature to target within a preset time, the second boiler is started. Each boiler is automatically rotated, typically every 48 h of burner running time, to extend boiler life and service intervals.

The 374e also controls domestic hot water, which is managed at 80°C.

For more information on this story, click here: May 09, 111

comments powered by Disqus

Search

Welcome

Welcome to Modern Building Services Online, the web edition of Modern Building Services (MBS) journal and the UK's most popular Building Services engineering site. Modern Building Services covers the entire Building Services Engineering industry. This site contains archived content from the journal, plus web-specific content.

When you go to our digital edition, you can also access the archive of digital editions.
March 2017: DIGITAL EDITION
ARCHIVE OF DIGITAL EDITIONS

Modern Building services has a group
on Linkedin - join us!

Jobs

  • Estates Project Manager (NHS)

      Working as part of the Hampshire Hospitals NHS Foundation Trust   Estates team, you will be responsible for developing capital projects from feasibility studies, through to delivery of refurbishments, backlog maintenance schemes and new builds. .........

more jobs »

Poll

"Is the Building Services industry lagging behind in the implementation of BIM?"



Calendar