Danlers heater boost switch for simply saving energy

Danlers, controls

Danlers’ heater boost switch for the control of electric heating loads automatically turns the load off after a selected time period has elapsed. There are four different time settings to choose from (15 min, 30 min, 1 h and 2 h). Pressing the button selects each timelag choice in turn. The switch is manufactured in the UK and is designed for use with immersion heaters, heated towel rails and other suitable electric heating loads. It is ideal for use in student accommodation blocks, hotels, military accommodation etc.

For more information on this story, click here: November 10, 209
Related links:
Related articles:



modbs tv logo

First keynote speakers announced by Europump

The first two keynote speakers have been announced for an annual event being hosted by the British Pump Manufacturers Association (BPMA).

‘Landmark’ prosecution of online seller welcomed by REFCOM

The air conditioning and refrigeration industry’s largest safety register REFCOM has welcomed the successful prosecution of online sales company Appliances Direct (AD) for breaching F-Gas Regulations.