School refurbishment uses Mikrofill boilers

Mikrofill, boiler, space heating, DHW

Heating for new and refurbished buildings at Langley Park School for Boys in Beckenham is provided by boilers from Mikrofill. The work included a state-of-the-art performance space, a new Sport England sports hall adjacent to the Phythian Building, which was refurbishment to match the new construction.

Design-and-build contractor LJJ of High Wycombe selected floor-standing condensing boilers and HWS Extreme loading systems for domestic hot water across the site.

Two twin-burner Ethos 350 kW boilers were installed in the new school to provide heating to numerous variable-temperature circuits. They also provide heat to a bank of Rapide Extreme HWS loading systems to produce over 2570 l/h of DHW at 60°C.

Two more of the same boilers were installed to serve the Phythian and sports hall buildings, along with a Mikrovent 750 low-loss header integral air and dirt separation.

A turndown ratio of 20:1 ensures excellent load matching and operating efficiency.

For more information on this story, click here: Dec 2013, 125
Related links:
Related articles:



modbs tv logo

New Sustainability Director for Wates Group

Wates Group, a family-owned development, building and property maintenance company, has appointed Cressida Curtis as its new Group Sustainability Director.

Domus Ventilation appoints new contractor sales managers

Ventilation systems manufacturer Domus Ventilation has announced the arrival of three new Contractor Sales Managers.