Lochinvar extends Squire range of indirect water heaters

Published:  02 July, 2014

DHW, water services, indirect water heater, Lochinvar

Lochinvar’s Squire range of indirect water heaters can be used with traditional boilers as pre-heat vessels for renewable technologies such as solar thermal or air-source heat pumps. There are 20 models with storage capacities from 290 to 2850 l. Eight units are also available with twin coils.

Most models in the Squire range can have an immersion heater added.

Peak draw-off capacities range from 597 to 5456 l in an hour at a 50 K temperature rise.

The integral coils in the Squire range have been sized to make them suitable for working with renewable technologies as well as traditional LTHW systems. The twin-coil versions offer an efficient and space-saving solution compared to integrated systems. Both coils can be used with an LTHW boiler to increase the recovery rate for hot water.

These water heaters are insulated and are finished with a grey outer casing with a black base and lid.

For more information on this story, click here: July 2014, 103

comments powered by Disqus

Search

Welcome

Welcome to Modern Building Services Online, the web edition of Modern Building Services (MBS) journal and the UK's most popular Building Services engineering site. Modern Building Services covers the entire Building Services Engineering industry. This site contains archived content from the journal, plus web-specific content.

When you go to our digital edition, you can also access the archive of digital editions.
July 2018: DIGITAL EDITION

ARCHIVE OF DIGITAL EDITIONS

Modern Building services has a group
on Linkedin - join us!

Jobs

  • Energy and sustainability: Performance and analysis manager

     An exciting opportunity will arise shortly for an exceptional person with extensive experience of managing sustainability within large complex organisations. Can you demonstrate extensive experience of energy management, proven ability to drive program......

more jobs »

Poll

"Is the Building Services industry lagging behind in the implementation of BIM?"



Calendar