Advance Appliances updates thermal store

Published:  05 January, 2016

boiler, space, heating, DHW, Advance Appliances, thermal store

Advance Appliances has updated its SFUTS multi-fuel thermal store by fitting and pre-wiring two electronic timers to it. The first timer is for the boiler to avoid overnight firing. The second is for the wood-burner input, with the timer turning off the pump on this circuit so that all the captured heat is kept in the store and not recirculated through the wood burner.

Advance suggests that installers can save at least three days on an installation by using a SFUTS thermal store. It takes away the thinking and design time. It removes the need to specify and buy components as they are fitted. And at the installation stage, the flow and return connections for the wood burner, boiler and central heating are made straight to connections on the tank. The only wiring needed is for the heating programmer and boiler live connections.

This stainless-steel unit has three A-rated pumps for integrating oil or gas boilers with solid-fuel appliances for mains pressure hot water and sealed central heating. There is a coil for solar thermal and two immersion heaters.

This thermal store operates as a sealed system. There are three levels of safety, the last of which is a mechanical thermal valve that will operate during power cuts.

The store is guaranteed for 10 years, and the fitted components are guaranteed for two years.

For more information on this story, click here: January 2016, 83

comments powered by Disqus

Search

Welcome

Welcome to Modern Building Services Online, the web edition of Modern Building Services (MBS) journal and the UK's most popular Building Services engineering site. Modern Building Services covers the entire Building Services Engineering industry. This site contains archived content from the journal, plus web-specific content.

When you go to our digital edition, you can also access the archive of digital editions.
April 2017: DIGITAL EDITION
ARCHIVE OF DIGITAL EDITIONS

Modern Building services has a group
on Linkedin - join us!

Jobs

  • Compliance Manager

    Working in the Estates Facilities Management Hard Services Team, directly line manage the Compliance Team of 8 staff. Ensure University building services and infrastructure are legally compliant and fit for purpose, to enable research, teaching and learn.........

  • Estates Project Manager (NHS)

      Working as part of the Hampshire Hospitals NHS Foundation Trust   Estates team, you will be responsible for developing capital projects from feasibility studies, through to delivery of refurbishments, backlog maintenance schemes and new builds. .........

more jobs »

Poll

"Is the Building Services industry lagging behind in the implementation of BIM?"



Calendar