Lochinvar upgrades CPM boiler range

Published:  03 March, 2016

Lochinvar, boiler, space heating

Lochinvar has upgraded its popular CPM range of condensing, gas-fired, stainless-steel, wall-hung boilers in line with the requirements of the European Eco-design of the Energy related Products (ErP) Directive. Lot 11 of this directive requires that integrated glandless circulating pumps have a maximum Energy Efficiency Index (EEI) no higher than 0.23. The revamped boilers all contain an A-rated integral fully modulating pump.

There are six models in the range with outputs from 58 to 175 kW and efficiencies of 95.2%, based on gross calorific value. Standard features include a cascade control system for up to 12 boilers.

CPM boilers can be connected to a building-management system, but also have a number of integral control features and options.

All CPM modules incorporate an open-therm connection that enables the boiler to manage up to 16 separated heating zones when optional EBC controllers are used.

Domestic hot water is available via the CPM — including a legionella pasteurisation programme, which is particularly useful when used with hot-water calorifiers and packaged plate heat exchangers.

For more information on this story, click here: March 2016, 111

comments powered by Disqus

Search

Welcome

Welcome to Modern Building Services Online, the web edition of Modern Building Services (MBS) journal and the UK's most popular Building Services engineering site. Modern Building Services covers the entire Building Services Engineering industry. This site contains archived content from the journal, plus web-specific content.

When you go to our digital edition, you can also access the archive of digital editions.
May 2017: DIGITAL EDITION
ARCHIVE OF DIGITAL EDITIONS

Modern Building services has a group
on Linkedin - join us!

Construction Week

Jobs

  • Compliance Manager

    Working in the Estates Facilities Management Hard Services Team, directly line manage the Compliance Team of 8 staff. Ensure University building services and infrastructure are legally compliant and fit for purpose, to enable research, teaching and learn.........

  • Estates Project Manager (NHS)

      Working as part of the Hampshire Hospitals NHS Foundation Trust   Estates team, you will be responsible for developing capital projects from feasibility studies, through to delivery of refurbishments, backlog maintenance schemes and new builds. .........

more jobs »

Poll

"Is the Building Services industry lagging behind in the implementation of BIM?"



Calendar