Ideal introduces more commercial boilers

Published:  03 March, 2016

Ideal Commercial Boilers, boiler, space heating

Ideal Commercial Boilers’ Imax Xtra EL range of floor-standing condensing boilers is available in five models with outputs from 320 to 620 kW. They have a single aluminium silicon alloy heat exchanger and are suitable for single and multiple installations for fully pumped, open-vented or pressurised systems.

Their compact size means they are easy to manoeuvre during installation and tak up only a small amount of space in the plant room.

These boilers outperform the 2015 ErP requirement and offer NOx Class 6 performance for maximum BREEAM points. Efficiency is up to 109.8% at 30% output.

There is a simple control interface with a large back-lit display. Integration with 0 to 10 V BMS systems is standard. Together with volt-free contacts and alarm signals, there is a range of additional kits for added control. They include a modulating sequencer, plant-room sensor, outside sensor and optional gateway adaptors to Modbus, LonWorks or BACnet.

For more information on this story, click here: March 2016, 109

comments powered by Disqus

Search

Welcome

Welcome to Modern Building Services Online, the web edition of Modern Building Services (MBS) journal and the UK's most popular Building Services engineering site. Modern Building Services covers the entire Building Services Engineering industry. This site contains archived content from the journal, plus web-specific content.

When you go to our digital edition, you can also access the archive of digital editions.
July 2017: DIGITAL EDITION
ARCHIVE OF DIGITAL EDITIONS

Modern Building services has a group
on Linkedin - join us!

Construction Week

Show

Jobs

  • Property Surveyor

    Property Surveyor/ Building Service Surveyor needed to work within the Technical Services team for the management of water hygiene/ legionella risk within DCC's property portfolio. We are looking for an experienced and dynamic team member to join our T......

more jobs »

Poll

"Is the Building Services industry lagging behind in the implementation of BIM?"



Calendar