JJB Fitness Clubs have been described as ‘the greatest success story of the last decade’, and around 15 new clubs are being opened each year.
Each club has two Hoval SR-plus Combination boiler packages that include CT-Plus calorifiers to provide instant hot water to showers and other DHW requirements. The compact package also incorporates a primary circulating pump and controls for the temperature of DHW.
The small footprint of the SR-Plus Combination package enables the plant to be installed in a relatively small space. The two boilers are energised to run on demand in a lead-lag configuration. The lead boiler meets the 24-hour heating demands of the swimming pool, while the lag boiler is brought in at times of peak demand for hot water. The lead and lag times of the two boilers are alternated to even out running time.
For more information on this story, click here: April 08, 128
Keywords: Hoval boiler



