These MSCBs provide heating and cooling and replace a cill-mounted fan-coil system. Removing these units makes it possible to accommodate 12 to 15 more work stations per floor, depending on its size and layout.
A feature of this project was the integration of control and commissioning valves into the beam instead of mounting them in the bulkhead.
For more information on this story, click here:July, 08 86
Keywords: Trox, Air-conditioning




