Plastic pipe saves site time and avoids risk of theft

Durapipe
All hot- and cold-water services for the £8.5 million relocation of a Doncaster school are provided by Durapipe Friatherm pipework in sizes up to 90 mm. Hill House St Mary’s independent school is moving to the site of the former RAF Finningley Officers’ Mess, and these buildings have been refurbished to cater for education needs while preserving original features such as ornate plasterwork, wooden flooring, windows and wooden panelling. Friatherm pipework was selected by mechanical contractor JGM because it offers significant cost and time savings on site. It does not require hot works and offers a one-step jointing technique. Other projects in the area have suffered from thefts of metal, so JGM stated that no copper pipework was to be used.
For more information on this story, click here: Nov08, 138
Related links:
Related articles:



modbs tv logo

Lighting the way

Halesowen College has set a sustainability example for higher education institutions by installing smart lighting as part of its latest environmental initiative, making up to 85% energy savings compared to the previous system.

BESA updates HIU Test Standard

The Building Engineering Services Association (BESA) has announced an important update to its UK Heat Interface Unit (HIU) Test Standard, further strengthening performance benchmarks and supporting the sector’s readiness for incoming heat network regulation.