Oventrop valves help fast-track refurbishment

Oventrop, valves
The fast-track refurbishment of this office building into a medical centre involved Oventrop valves throughout.

Oventrop valves were selected by building-services consultants Bianco Sale to facilitate a fast-track refurbishment project in Tunbridge Wells to convert the offices of an insurance company into a health centre for Assura. When complete, the medical centre will accommodate several general practices, diabetic suite, renal unit and a pharmacy.

Mechanical contractor Steadman Environmental stripped out an existing heating system in the 4-storey building and installed a new one to suit the varied occupancies. Hot water is generated by a gas-fired boiler in a new roof-top plant room and circulates throughout the core areas by the new main distribution system.

Radiators fitted with Oventrop TRV/lockshield combinations serve the core areas. The radiator circuits have Hydromat differential valves to reduce commissioning times and improve dynamic balance. The hot-water system is equipped with Aquastrom T Plus automatic regulating valves for secondary circulation.

For more information on this story, click here: March10, 80
Related links:
Related articles:



modbs tv logo

Lighting the way

Halesowen College has set a sustainability example for higher education institutions by installing smart lighting as part of its latest environmental initiative, making up to 85% energy savings compared to the previous system.

BESA updates HIU Test Standard

The Building Engineering Services Association (BESA) has announced an important update to its UK Heat Interface Unit (HIU) Test Standard, further strengthening performance benchmarks and supporting the sector’s readiness for incoming heat network regulation.