Remeha’s new boiler meets challenges of St Davids Cathedral

Remeha, boiler, space heating

With all four boilers in St Davids Cathedral in Pembrokeshire beginning to fail, Andrew Thomas of contractor G. G. Thomas & Son recommended replacing them with just two of the newly launched Quinta Ace boiler from Remeha Commercial. These boilers can be wall-hung or cascaded and have an output of 160 kW.

The large output and small size of these boilers overcame the problem of the small plant room at the cathedral, requiring only fraction of the space of other boilers.

Andrew Thomas said,’ Taking onto account the output required to heat the cathedral, the space constraints of the plant room and the fabric of the building, the Remeha Quinta Ace 160 was the most suitable boiler for this project. Such a compact boiler with such a high output.’

For more information on this story, click here: August 2016, 123
Related links:
Related articles:



modbs tv logo

BCIA welcomes tougher commercial building energy standards but calls for greater ambition across the wider sector

The Building Controls Industry Association (BCIA) has welcomed the government’s confirmation that privately rented non-domestic buildings over 1,000 square metres in England and Wales will be expected to achieve a minimum EPC B rating by 2031, describing the move as an important step forward in improving the energy performance of the UK’s commercial building stock.

GOLDBECK commits to three-year schools partnership to inspire Cardiff’s future construction talent

GOLDBECK has launched a new long-term education initiative in Cardiff, committing to support three local primary schools as part of a programme designed to introduce young children to enterprise, careers and the wider world of construction.