Clamp-on sensors put through their capabilities for piped services

Micronics, ultrasonic flow measurement

PA Energy, which specialises in the supply, installation and ongoing monitoring of turnkey sub-metering system, has used ultra-sonic, clamp-on flow- and heat-metering products from Micronics to good effect on a wide range of projects for saving water and/or energy. The projects have included rainwater harvesting, fuel-cell and solar-thermal installations on commercial buildings in the London area. Clamp-on meters avoid a whole range of installation issues associated with inline meters.

For the rainwater-harvesting projects, a claim for a reduction in the sewage charge is being developed by using a Micronics U3000 to demonstrate how much rainwater is being dumped to sewage by metering the amount of water being pumped into a grey-water tank in comparison to the boosted cooling water entering the tank.

Another application was measuring LTHW flow from a fuel-cell calorifier, again using a U3000, to demonstrate the performance of the fuel-cell process.

Another project involved monitoring heat from a solar-thermal installation by the flow rate of the water-glycol mix and its flow and return temperature to and from the buffer vessel to demonstrate that it was performing to specification.

Percy Albuquerque, managing director of PA, says, ‘Micronics clamp-on heat meters have proved to be an effective component in providing accurate water-flow and heat-measurement data for our web-based aM&T [automatic monitoring and targeting] and data-analysis services. The product performance has been good, even on partially filled pipes. On the rare occasions that we have had application problems, the Micronics support has been good.’

For more information on this story, click here: June 2012, 125
Related links:
Related articles:



modbs tv logo

BCIA welcomes tougher commercial building energy standards but calls for greater ambition across the wider sector

The Building Controls Industry Association (BCIA) has welcomed the government’s confirmation that privately rented non-domestic buildings over 1,000 square metres in England and Wales will be expected to achieve a minimum EPC B rating by 2031, describing the move as an important step forward in improving the energy performance of the UK’s commercial building stock.

GOLDBECK commits to three-year schools partnership to inspire Cardiff’s future construction talent

GOLDBECK has launched a new long-term education initiative in Cardiff, committing to support three local primary schools as part of a programme designed to introduce young children to enterprise, careers and the wider world of construction.