Health trust replaces boilers and water heaters with Hamworthy

Refurbishment of the plant room at the 20-bed Molesey Hospital in Surrey has seen two Purewell Variheat 70 kW gas-fired boilers from Hamworthy Heating replace three gas-fired atmospheric boilers. Hot water is provided by two Dorchester DR-FC Evo30 direct-fired condensing water heaters. The project was one of more than 20 carried out by NHS Surrey to reduce carbon emissions and replace boilers and water heaters that were coming to the end of their economical life.

Gary White, programme manager with Surrey Primary Care Trust, says, ‘The trust estates department wanted to standardise boilers and equipment across the different sites, and the diverse range of products that Hamworthy Heating offers enabled us to choose the most suitable boiler and water heater for each application.’

The new boilers at Molesey Hospital have seasonal efficiencies of 95% compared with 78% before. The turndown ratio is 7:1 compared to 3:1 before. Fewer boilers also reduce service and maintenance costs.

For more information on this story, click here: May 2013, 87
Related links:
Related articles:



modbs tv logo

BCIA welcomes tougher commercial building energy standards but calls for greater ambition across the wider sector

The Building Controls Industry Association (BCIA) has welcomed the government’s confirmation that privately rented non-domestic buildings over 1,000 square metres in England and Wales will be expected to achieve a minimum EPC B rating by 2031, describing the move as an important step forward in improving the energy performance of the UK’s commercial building stock.

GOLDBECK commits to three-year schools partnership to inspire Cardiff’s future construction talent

GOLDBECK has launched a new long-term education initiative in Cardiff, committing to support three local primary schools as part of a programme designed to introduce young children to enterprise, careers and the wider world of construction.