Mikrofill supports CHP and solar installation

Mikrofill, boiler, DHW, space heating

As part of the CHP-based system and solar-thermal installation for updating heating and hot water at Rydale Swimming Pool in Pickering, Mikrofill has supplied boilers and energy-efficient hot-water cylinders.

Equipment installed by H. Pickup Mechanical & Electrical services of Scarborough includes two floor-standing boilers with a combined output of 700 kW and turndown to 35 kW. These boilers also supply two Extreme hot-water loading systems to produce up to 2370 l/h at 60°C while keeping the boilers in condensing mode.

Consulting engineer for the project was Preston Lee Chambers of Cheshire.

For more information on this story, click here: Nov 2013, 123
Related links:
Related articles:



modbs tv logo

LG supports fast-moving WeWork project

How LG Air Conditioning helped WeWork London achieve a fast project with great results.

Why we need an Office of Construction

Rudi Klein, chief executive of the SEC Group shares his vision of why we need an Office of Construction to help bring about much-needed change.

Calendar