Mikrofill replaces boilers in CHP plant at Bedford Hospital

Mikrofill, boilers, space heating, DHW, hot water, Energy efficiency

The replacement of existing CHP plant at Bedford Hospital includes boilers supplied by Mikrofill. The three Ethos boilers each have an output of 130 kW and will primarily serve the hospital’s HWS demand. They are configured to provide heat into the main system when hot-water requirements are at a minimum.

These boilers have stainless-steel heat exchanges and operate in cascade so that the total output of 390 kW can be modulated down 13 kW for precise load matching.

The scheme is fully sequenced to ensure that the LTHW boilers serve heating in preference to the existing steam-to-LTHW heat exchanges. This takes load off the central plant and improves overall system efficiency.

For more information on this story, click here: August 2016, 89
Related links:
Related articles:



modbs tv logo

LG supports fast-moving WeWork project

How LG Air Conditioning helped WeWork London achieve a fast project with great results.

Stephen Preece on the future of MEES

Stephen Preece on why the next iteration of MEES needs to set higher targets to encourage greater action.

Calendar