London hospital converts large boilers to condensing operation with add-on system

Thermal Energy, condensing boilers, heat recovery
Thermal Energy’s Flu-Ace system has been used to add condensing operation to large boilers at King’s College Hospital.

Large boilers at King’s College Hospital in south-east London have been converted to condensing operation using Thermal Energy International’s Flu-Ace heat-recovery system to recover up to 90% of the heat that is normally lost. The order was worth £303 000. The syste4m is expected to reduce energy consumption by over 8 GWh a year and reduce CO2 emissions by over 1500 t a year.

A single Flu-Ace can handle a varying flow of flue gases from multiple boilers. This results in a lower initial investment, cheaper operating costs and a higher return on investment than dedicated equipment for each boiler exhaust. A full payback is achieved in less than three years, with savings continuing throughout the unit’s operating life of 20+ years.

A variable-speed induced draught fan at the tower outlet automatically maintains the optimum flue-gas static set point at the tower outlet — preventing interference with upstream processes.

For more information on this story, click here: July 10, 81
Related links:
Related articles:



modbs tv logo

EBSSA publishes Strategic Skills Plan

The Engineering and Building Services Skills Alliance (EBSSA) has published its strategic Sector Skills Plan, as part of the work undertaken by the Construction Mission Skills Board.

AI automation boosts efficiency at Polypipe Building Services’ manufacturing site

Polypipe Building Services has enhanced manufacturing efficiency, productivity and sustainability through a major programme of automation investment at its production facility in Aylesford.