GSH wins FM contract at Amsterdam Airport

KLM
GSH has won a 3-year facilities-management control with the operator of Amsterdam Airport, Schiphol Nederland BV. The contract covers ‘hard services’ at Terminal 3, Schiphol Plaza and piers E, F and G — totalling 275 00 m2 of floor space. The two key priorities are to maximise plant operating efficiency through excellence in technical engineering and maintain a comfortable passenger environment. The contract covers round-the-clock maintenance and management of M&E and fire-protection installations and will be undertaken by an on-site FM team. A programme of planned preventive maintenance will enhance reliability and create long-term value. This programme will be based on a series of whole-life-costing criteria, including improved plant life and lower average running costs. www.gshgroup.com/
Related links:



modbs tv logo

Nuaire celebrates long service and a people-first culture built over decades

Nuaire has celebrated the exceptional loyalty and dedication of its employees at a long service awards event – a powerful reflection of a workplace culture that has been built and sustained over generations.

New advanced training facility opens to upskill HVAC industry

A new education facility has opened its doors and is set to advance skills and knowledge across the UK’s HVAC industry.