Panasonic 3-way heat-recovery control boxes for VRF air conditioning

Panasonic, air conditioning, VRF, control box, heat recovery, energy recovery

Panasonic’s range of 3-way heat-recovery control boxes for VRV air-conditioning systems is available with four, six and eight connection ports to give installers considerable flexibility on site. These control boxes have connection tubes for the main refrigerant circuit line on both sides of the unit

These control boxes remove the need for purchasing individual 3-way PCB kits and solenoid valves for each indoor unit. A control line can be fed from the unit via a relay kit, which is included in the package as an accessory, straight to the multiple-connection box. A power line is then fed directly form the multiple-connection box to the power supply, so there is no need for a power supply from each indoor unit to each individual solenoid valve kit.

The 3-way control box can be installed after a distribution joint, before a T branch and with a number of different control methods — such as group control, simultaneous operation under one port and group operation under one port.

For more information on this story, click here: Oct 2015, 160
Related links:
Related articles:



modbs tv logo

‘Red tape scrapping is welcome – but more policy changes are needed’

The CEO of heat pump manufacturer Aira UK has said the government’s new proposals to scrap planning red tape for the installation of heat pumps in the UK will be a big breakthrough for the industry and consumers – but more policy changes are needed.

New procurement rules for NHS suppliers

New procurement rules mean NHS suppliers will need to demonstrate their green credentials so the NHS can achieve its target of becoming net zero for directly-controlled emissions by 2040, with an ambition to reach an 80% reduction in its carbon emissions between 2028 to 2032.