Baxi Commercial companies score at Shrewsbury Town FC

Baxi Commercial
Space-heating and domestic hot water for the new Prostar stadium of Shrewsbury Town Football Club are provided by equipment from Potterton Commercial and Andrews Water Heaters, both part of Baxi Commercial Division.

Andrews Water Heaters and Potterton Commercial have contributed to the success of Shrewsbury Town Football Club’s new 9875-seat Prostar stadium by meeting the hot-water and heating requirements.

The equipment installed in a plant room in the west stand comprises two Andrews gas-fired storage water heaters and two Potterton Eurocondense boilers. This stand houses the changing rooms and banqueting facilities.

The water heaters are twinned into a flue header that vents to atmosphere at roof level. They are low-profile models with a small footprint. They serve changing rooms, toilets, bar, restaurant, kitchens and corporate facilities.The models installed have a storage capacity of 368 l and a recovery rate of 1200 l/h through 44 K.

The Potterton boilers are also extremely compact, so they fit through a standard 600 mm doorway. The gas-fired boilers have an output of 160 kW and meet the space-heating requirement for the changing rooms, offices, toilets, bar, kitchen and restaurant. Among their features are built-in weather compensation, summer/winter changeover and time-control facilities. In this installation, the ISR control system is integrated with the building-management system.

Coalway Building Services was the mechanical-services contractor for the project.

For more information on this story, click here: Feb 09, 121
Related links:
Related articles:



modbs tv logo

‘Red tape scrapping is welcome – but more policy changes are needed’

The CEO of heat pump manufacturer Aira UK has said the government’s new proposals to scrap planning red tape for the installation of heat pumps in the UK will be a big breakthrough for the industry and consumers – but more policy changes are needed.

New procurement rules for NHS suppliers

New procurement rules mean NHS suppliers will need to demonstrate their green credentials so the NHS can achieve its target of becoming net zero for directly-controlled emissions by 2040, with an ambition to reach an 80% reduction in its carbon emissions between 2028 to 2032.