Basildon Sporting Village enjoys the benefits of solar thermal domestic hot water

MHS Boilers, Solar thermal, DHW
Solar-thermal hot water for this new sports facility in Basildon is provided by equipment supplied by MHS Boilers.

A 30 m2 solar-thermal installation at the recently opened Everyone Active Basildon Sporting Village in Essex meets a large proportion of the requirements for domestic hot water. Supplied by MHS Boilers, the Solartron R2.5 panels operate in conjunction with two 3000 l Abondance buffer storage vessels and a 1775 l Inox-Max preheat single-coil cylinder.

This facility is one of the best equipped sporting venues in the county and is part of a joint venture between Basildon District Council and Com­munity Solutions for Leisure. It is the new home of the South Essex Gymnastics Club and could become a training centre for elite athletes. Facilities include a 50 m swimming pool, fitness centre, multi-purpose studio and an 8-court sports hall.

Solartron R2.5 flat-panel collectors are a low-cost system that gets good energy returns all year. They incorporate a full-sheet copper absorber with a highly selective coating.

The size of the panels and the flexible mounting system make installation easy. The collectors can be mounted on tiled roofs in several rows, one above the other. For installation on flat roofs or ground mounting, an aluminium frame system is available.

For more information on this story, click here:  August 2011, 133
Related links:
Related articles:



modbs tv logo

‘Red tape scrapping is welcome – but more policy changes are needed’

The CEO of heat pump manufacturer Aira UK has said the government’s new proposals to scrap planning red tape for the installation of heat pumps in the UK will be a big breakthrough for the industry and consumers – but more policy changes are needed.

New procurement rules for NHS suppliers

New procurement rules mean NHS suppliers will need to demonstrate their green credentials so the NHS can achieve its target of becoming net zero for directly-controlled emissions by 2040, with an ambition to reach an 80% reduction in its carbon emissions between 2028 to 2032.