Two Waitrose stores will become carbon negative

A biomass energy centre that will reduce carbon emissions by over 1000 t a year is being developed for Waitrose’s new store in Bracknell. MITIE has started work on the tri-generation plant, which will supply the supermarket with heat, electricity and chilled water.

This is the second energy centre MITIE has developed for Waitrose. The first is at the store in East Cowes and will be up and running in December 2011.

The Bracknell plant will source wood chips from local sustainable woodlands and is due to be operational by the end of March 2012. It will be housed in a new building next to the supermarket, with the absorption chiller, dry air cooler and cooling tower in the main store plant well.

The energy centre at East Cowes will provide the same energy and carbon saving as at Bracknell. Both stores will be carbon negative.

Related links:
Related articles:



modbs tv logo

‘Red tape scrapping is welcome – but more policy changes are needed’

The CEO of heat pump manufacturer Aira UK has said the government’s new proposals to scrap planning red tape for the installation of heat pumps in the UK will be a big breakthrough for the industry and consumers – but more policy changes are needed.

New procurement rules for NHS suppliers

New procurement rules mean NHS suppliers will need to demonstrate their green credentials so the NHS can achieve its target of becoming net zero for directly-controlled emissions by 2040, with an ambition to reach an 80% reduction in its carbon emissions between 2028 to 2032.