London academy links to district-heating scheme

Space heating, District heating, CPV Hiline
District heating from the Aylesbury Estate in Southward is brought to Walworth Academy by CPV pre-insulated steel pipe.

District heating has been brought to a school in Southwark, London, using 700 m of 125 mm-diameter CPV Hiline steel pre-insulated pipe to connect it to the local district-heating scheme. The scheme serves the rebuilding and expansion of Walworth Academy’s facilities, which include a state-of-the-art study environment for engineering, science, technology and mathematics.

The heating system also supplies a sports hall, performance area, entrance and atrium.

The Hiline pipe system was selected to meet the strict specifications of thermal efficiency, durability and strength stipulated in Southwark Council’s project brief.

The installation includes a leak-detection alarm monitoring system and was carried out by T. Brown Group.

At one point near the academy buildings, obstructions forced a deviation from the planned pipe route, requiring a special section of pipework to be fabricated. CPV acted swiftly to keep the project ahead of schedule.

The supply pipes operate at 2 bar to deliver hot water from a pair of Rycroft shell-and-tube heat exchangers in a new plant room. They are supplied by a boiler house dating back to the late 1960s when it was constructed to feed into the Aylesbury Housing Estate MTHW district-heating scheme.

For more information on this story, click here: November 2012, 105
Related links:
Related articles:



modbs tv logo

Finalists announced for the 2025 Pump Industry Awards

The Pump Industry Awards has revealed its highly anticipated finalists for 2025, showcasing the very best in innovation, performance and contribution across the pump sector. The winners will be celebrated at the prestigious gala dinner on Thursday 13th March at the Hilton Hotel, St. Georges Park in Burton on Trent.

Electrical businesses brace for project delays in 2025

The latest quarterly Building Engineering Business Survey (BEBS) has revealed that close to two thirds (63%) of electrotechnical and engineering services businesses are worried about delays to projects and the impact this can have on cashflow.