Commissioning valves are the trusted first step to a well balanced system.

With energy costs continuing to rise, Albion Valves UK advises contractors and heating engineers that a well balanced commercial heating system can help address energy wastage. In a poorly balanced system, problems such as irregular temperature control and inconsistent water circulation can occur — driving up operating costs, creating maintenance issues and wasting energy.

Albion highlights several benefits of a balanced system.

•Efficient operation.

•Constant desired room temperature.

•Responsible use of resources.

•Lower maintenance costs.

•Lower carbon emissions.

A well balanced system ensures energy is distributed to where it is needed, as opposed to some areas becoming too hot and others too cold.

Commissioning valves are a trusted first step to a well balanced system. With the growing use of dynamic balancing valves, this can be achieved without the need for complex commissioning processes. The cost of commissioning is generally a small fraction of the total system design cost, but delivers significant savings.

Les Littlewood, sales director, explains, ‘A well-balanced system starts with good system design. The designer calculates the mass of water required at each terminal unit, whether heating or cooling. Balancing valves create additional resistance in each branch to direct water in the required proportion to each terminal unit.

‘Initial design considerations will take into account the size of space to be conditioned, space usage, occupancy, construction materials and their thermal properties, heat losses and gains and general climatic conditions associated with the building.’

Achieving optimum flow rate is essential. Too high a flow rate may cause noise, energy wastage via overflow, pumping costs and potentially poor comfort as a result of overheating. Too low a flow rate may not dislodge entrapped air.

Flow velocities will generally be in the range 0.75 to 1.15 m/s for pipe sizes 1/2 in to 2 in and 0.75 to 3 m/s for size DN65 to DN300 with pipe pressure drop per meter length generally calculated at 140 to 280 kPa. 

For more information on this story, click here: June 2014, 101

comments powered by Disqus

Search

Welcome

Welcome to Modern Building Services Online, the web edition of Modern Building Services (MBS) journal and the UK's most popular Building Services engineering site. Modern Building Services covers the entire Building Services Engineering industry. This site contains archived content from the journal, plus web-specific content.

When you go to our digital edition, you can also access the archive of digital editions.
October 2017: DIGITAL EDITION
ARCHIVE OF DIGITAL EDITIONS

Modern Building services has a group
on Linkedin - join us!

Show

Jobs

  • Intermediate / Senior Mechanical Engineer

    The Mechanical team undertake the design and specification of a range of Mechanical building services in a lead or supporting role, depending on project complexity and scale. You should demonstrate a flexible approach to design and team working and wil......

  • Senior Urban Designer

     Applicants will be Master’s Degree qualified Architects / Urban Designers, with a strong portfolio of work highlighting a variety of projects at a range of scales and types, with strong focus on regeneration, infrastructure-led projects and major develo......

  • Principal Structural Engineer

    We are currently recruiting on behalf of a global client, with a diverse range of award winning projects to their name. Their experience spans a host of market sectors, including transport, infrastructure, defence, scientific, education, high-tech and ......

more jobs »

Poll

"Is the Building Services industry lagging behind in the implementation of BIM?"



Calendar