Upgrade work gives new life to fan-coil units

Ability
Some 160 fan-coil units in St Olaf House near London Bridge have been given a new lease of life following servicing and upgrading by Fan Coil Service.
As part of the refurbishment of St Olaf House near London Bridge, Fan Coil Service has serviced and upgraded over 160 fan-coil units. Fan Coil Service is the recently established servicing and preventive-maintenance arm of Ability Projects. These fan-coil units are vertical and horizontal Atholl units made in the late 1980s and long since out of production. The vertical units are in architectural cases around the perimeter of the 6-storey building. The horizontal units are in the ceiling void. The work involved cleaning all units and making and fitting new EU2 media filters. The original single/double shaft tap-wound motor fans were replaced with new double-inlet 4-pole ebm-papst fans with external-rotor motors. Multi-tapped 1.5 A transformers with speed switch were also fitted, enabling three speed settings to be selected from six available. In addition, the original Satchwell controllers and actuators were replaced with modern equivalents. Depending on their condition, each fan-coil unit took from 30 min to 3 h to service and upgrade. They were then all recommissioned by Fan Coil Service.
Related links:



modbs tv logo

‘Red tape scrapping is welcome – but more policy changes are needed’

The CEO of heat pump manufacturer Aira UK has said the government’s new proposals to scrap planning red tape for the installation of heat pumps in the UK will be a big breakthrough for the industry and consumers – but more policy changes are needed.

New procurement rules for NHS suppliers

New procurement rules mean NHS suppliers will need to demonstrate their green credentials so the NHS can achieve its target of becoming net zero for directly-controlled emissions by 2040, with an ambition to reach an 80% reduction in its carbon emissions between 2028 to 2032.