Sentinel water-treatment chemicals come in small packages

Published:  04 January, 2017

Sentinel, water treatment, corrosion, pipes, pipework

Delivering lifetime protection from corrosion and limescale in commercial heating and cooling system can be achieved using Sentinel Commercialís Triple Power water-treatment chemicals. These chemicals can dose systems three times larger than previous formulations.

The Triple Power range comes in a 5 l drum to treat a system volume of 1667 l, a 10 l drum for 3333 l and a 20 l drum for 6666 l. The previous formulations were available in drum sizes of 10 l to treat 1000 l and 20 l to treat 2000 l.

Triple Power chemicals are part of Sentinelís best-practice system of clean, protect and maintain.

Practically speaking, an installer would use Triple Power X300 cleaner to remove installation debris, flux residue and greases from a new system or X400 cleaner to remove black iron oxide and other corrosion debris in older systems ó followed by X100 inhibitor to protect the system.

Maintenance involves the regular use of Sentinelís SystemCheck to analyse system water and the implementation of corrective action if required.

For more information on this story, click here: Jan 2017, 160

comments powered by Disqus

Search

Welcome

Welcome to Modern Building Services Online, the web edition of Modern Building Services (MBS) journal and the UK's most popular Building Services engineering site. Modern Building Services covers the entire Building Services Engineering industry. This site contains archived content from the journal, plus web-specific content.

When you go to our digital edition, you can also access the archive of digital editions.
March 2017: DIGITAL EDITION
ARCHIVE OF DIGITAL EDITIONS

Modern Building services has a group
on Linkedin - join us!

Jobs

  • Estates Project Manager (NHS)

    † Working as part of the Hampshire Hospitals NHS Foundation Trust † Estates team, you will be responsible for developing capital projects from feasibility studies, through to delivery of refurbishments, backlog maintenance schemes and new builds. .........

more jobs »

Poll

"Is the Building Services industry lagging behind in the implementation of BIM?"



Calendar