Smart money is on Trend at SkyCity, Auckland

Published:  03 May, 2017

Trend Control Systems, BEMS, BMS, BACnet

The updated control infrastructure in one of New Zealand’s premier attractions, SkyCity Auckland, uses equipment from Trend Control Systems to maximise efficiency and create the very best comfort conditions. It is the tallest building in New Zealand, and its 328 m SkyTower has dominated the skyline for 20 years.

There are glass-fronted lifts to three viewing platforms, and adrenaline junkies can take a leap off the SkyTower via the SkyJump.

At the base of SkyTower is the SkyCity entertainment complex with a casino, bars and restaurants, a 700-seat theatre, convention centre and two hotels.

The original controls infrastructure had become unreliable and inefficient, so a replacement was needed

Stuart Bryant, facility services manager, explains, ‘The previous system was costing an increasingly large amount of time, effort and money to maintain. It was a closed protocol, which meant we were tied to one vendor. The time had come to invest in a new BEMS, so I contacted Control Air to see what we could do.

Control Air is one of Auckland’s leading designers and installers of BEMSs and a long-standing Trend Systems Integrator.

The project gave the opportunity to uses the latest devices from Trend and utilise the advantages of an open-protocol solution.

Control Air began by carrying out an energy audit to review how the building was being used and identify opportunities for saving energy. A full business case was presented, with expected return on investment.

Central to the strategy was Trend IQ Vision, which integrates Trend controllers, third-party smart devices and Internet protocols into a centralised software platform that is designed to manage buildings at an enterprise level, giving building owners and managers the ability to identify issues and optimise their systems.

Five new user workstations connect to the IQ Vision server via a client connection for management and maintenance staff to use. They have access to the system, with remote access to the site, via a VPN (virtual private network) connection.

The BEMS operates over a new structured cabling system using Cat 6 copper cable. Connected to it is BACnet-protocol master-slave/token passing (MS/TP) communications cabling which is linked in turn to mechanical-services control panels.

To minimise disruption, the project had to be completed in a fully operational site with no downtime or unoccupied periods. To assist with this, all panels were pre-configured. It was also necessary to integrate some existing BACnet controllers into the BEMS, which was made easier by Trend’s open protocol.

For more information on this story, click here: May 2017, 121

comments powered by Disqus

Search

Welcome

Welcome to Modern Building Services Online, the web edition of Modern Building Services (MBS) journal and the UK's most popular Building Services engineering site. Modern Building Services covers the entire Building Services Engineering industry. This site contains archived content from the journal, plus web-specific content.

When you go to our digital edition, you can also access the archive of digital editions.
August 2017: DIGITAL EDITION
ARCHIVE OF DIGITAL EDITIONS

Modern Building services has a group
on Linkedin - join us!

Construction Week

Show

Jobs

  • Field Sales Executive

    Successful professional technical salesperson required to sell to consultants and contractors. Unique opportunity to sell ultra-low energy, patented technology, ventilation products from a UK manufacturer. ...

  • Property Surveyor

    Property Surveyor/ Building Service Surveyor needed to work within the Technical Services team for the management of water hygiene/ legionella risk within DCC's property portfolio. We are looking for an experienced and dynamic team member to join our T......

more jobs »

Poll

"Is the Building Services industry lagging behind in the implementation of BIM?"



Calendar