Plastic pipe brings new life to district heating

Flexenergy, district heating, pipework, preinsulated

The lifecycle and environmental benefits of pre-insulated polybutene pipe technology were the main reasons for it replacing legacy steel pipe in a district-heating scheme in Wandsworth. A total of 1140 m of the pipe was supplied by Flexenergy after the steel network was coming to the end of its useful life.

The new pre-insulated pipe will improve thermal efficiency. It is also recyclable and has a longer life than steel. The system helps meet the heating and hot-water needs of over 160 households.

Sandy Fairley, sales director with Flexenergy, says, Many contractors are now choosing our fully welded, all-plastic, corrosion-free pipework for district-heating schemes. It can handle flow temperatures of 70°C for an estimated 98 years.’

For more information on this story, click here: Sept 2017, 125
Related links:
Related articles:



modbs tv logo

‘Red tape scrapping is welcome – but more policy changes are needed’

The CEO of heat pump manufacturer Aira UK has said the government’s new proposals to scrap planning red tape for the installation of heat pumps in the UK will be a big breakthrough for the industry and consumers – but more policy changes are needed.

New procurement rules for NHS suppliers

New procurement rules mean NHS suppliers will need to demonstrate their green credentials so the NHS can achieve its target of becoming net zero for directly-controlled emissions by 2040, with an ambition to reach an 80% reduction in its carbon emissions between 2028 to 2032.