MHG supplies heat and water in packaged solution

Published:  07 March, 2018

MHG Gassero, Exeter College

MHG Gassero has supplied three Superbox gas-fired condensing boilers to Exeter College to provide space heating and hot water at the college’s Laurence Building. The 2 x 1MW and 1 x 500kW Superbox boilers, were installed in a packaged plant room that was delivered to site in two halves.

The Superbox boilers integrate with the college’s BMS and have a turndown from 2,500kW to 37kW across the three boilers. This ensures excellent load matching and optimum efficiency.

The new packaged plant room is located alongside an existing packaged unit which will become redundant once the changeover of services is completed by Mitie Building Services of Exeter. The new plant room was designed and specified by Hoare Lea of Plymouth and manufactured by Packaged Plant Solutions of Milton Keynes.

For more information on this story, click here: March 2018, 122

comments powered by Disqus

Search

Welcome

Welcome to Modern Building Services Online, the web edition of Modern Building Services (MBS) journal and the UK's most popular Building Services engineering site. Modern Building Services covers the entire Building Services Engineering industry. This site contains archived content from the journal, plus web-specific content.

When you go to our digital edition, you can also access the archive of digital editions.
April 2018: DIGITAL EDITION

ARCHIVE OF DIGITAL EDITIONS

Modern Building services has a group
on Linkedin - join us!

Jobs

  • Design Coordinator (M&E)

    Who are we Founded in 1992 and with over 700 staff, Galliard is a property development, hospitality and management group overseeing mixed-use, residential, hotel and commercial projects across London and Southern England with a £4.06 billion portfolio o......

more jobs »

Poll

"Is the Building Services industry lagging behind in the implementation of BIM?"



Calendar