The project at Southbury Court involved replacing three outdated steel boilers and forced-draught burners with a pair of Stokvis Econoflame R2708 boilers and two E4A19 Econoplate heat exchangers to meet the heating and hot-water requirements of the 35 flats.
Stokvis also supplied an Econopress unit to maintain adequate pressure throughout the 10-storey building.
Vican Consultants specified the plant, which was installed by Daystone Services.




