TA Hydronics provides unique solution for Uniqa Tower

TA Hydronics, balancing, commissioning
Helping to deliver energy-efficient comfort for the Uniqa Tower in Vienna is a hydronic solution designed with the help of TA Hydronics.

TA Hydronics’ expertise was called upon to provide the hydronic solution for heating and cooling the 75 m-high Uniqa Tower in Vienna, Austria. The efficient heating and cooling system that resulted have led to the building being awarded an EU Greenbuilding Certificate. A third of the building's energy consumption is provided for by a heat pump and geothermal heating.

By supporting the project consultant Altherm Planungs-Ges and installer Heiz-Hofstaetter, TA Hydronics was able to design a variable-flow system that would heat the building via convectors and cool it using ceiling systems. This solution was based on the TBV-C terminal balancing valve, the STAD manual balancing valve, the STAP differential-pressure controller and KTM balancing valves to control all circuits.

Josef Beisteiner of TA Hydronics, comments, ‘Due to the issues that often surround the heating and cooling of tall buildings, it was necessary for us to provide a solution that would ensure that a comfortable climate was achievable at all times.

‘Using our specialist balancing valves and expert level of knowledge, we were able to support the consultant and installer when the system was first designed and then later installed to provide a well balanced system that would be able to meet the intensive energy demands expected from the building whilst functioning to an advanced level of energy efficiency.’

For more information on this story, click here: July 2011, 130
Related links:
Related articles:



modbs tv logo

‘Red tape scrapping is welcome – but more policy changes are needed’

The CEO of heat pump manufacturer Aira UK has said the government’s new proposals to scrap planning red tape for the installation of heat pumps in the UK will be a big breakthrough for the industry and consumers – but more policy changes are needed.

New procurement rules for NHS suppliers

New procurement rules mean NHS suppliers will need to demonstrate their green credentials so the NHS can achieve its target of becoming net zero for directly-controlled emissions by 2040, with an ambition to reach an 80% reduction in its carbon emissions between 2028 to 2032.