Prefabricated pumping station for wastewater

Rapid removal of wastewater from areas of buildings below sewer level can be achieved using the Synconta 801 pumping and lifting station from ABS Pumps. It has a tank of over 750 l and can operate with a wide variety of wastewater and sewage pumps. Made from polyethylene, the Synconta is supplied with an ABS Piranha or AS range submersible pump, stainless-steel internal pipework and built-in check valve. An adjustable riser is supplied, and there are several pre-formed inlet ports.
Related links:



modbs tv logo

BCIA welcomes tougher commercial building energy standards but calls for greater ambition across the wider sector

The Building Controls Industry Association (BCIA) has welcomed the government’s confirmation that privately rented non-domestic buildings over 1,000 square metres in England and Wales will be expected to achieve a minimum EPC B rating by 2031, describing the move as an important step forward in improving the energy performance of the UK’s commercial building stock.

GOLDBECK commits to three-year schools partnership to inspire Cardiff’s future construction talent

GOLDBECK has launched a new long-term education initiative in Cardiff, committing to support three local primary schools as part of a programme designed to introduce young children to enterprise, careers and the wider world of construction.