Three separate circuits from new Hamworthy wall-hung boilers

For maximum flexibility, Hamworthy Heating’s Milborne 502 condensing boiler has two 50 kW heat exchangers to give a total capacity of 100 kW in a single casing.
Built environment professionals remain positive on future of Net Zero
A recent survey by global climate tech firm IES has revealed that nearly three-quarters of UK built environment professionals believe achieving a Net Zero built environment by 2050 is within reach.
BESA research suggests clients are yet to engage with new building safety regime
Construction clients are failing to engage with the new building safety regime, according to research carried out by the Building Engineering Services Association (BESA).