Elco supplies CHP for London hotel project

Elco, CHP, MHS, Energy Efficiency
CHP is one of the technologies supplied by Elco UK for this new hotel in London.

Two CHP units supplied by Elco UK, along with boilers and hot-water cylinders supply heating and hot water to the new Qbic Hotel in Whitechapel, London. This complete refurbishment of an empty office building has 171 bedrooms, all of were prefabricated and shipped flat-packed from China for assembling in a day.

There are two GB6-12 (6 kW of electricity and 12 kW of heat) Energator CHP units teamed up with two 145 kW Thision L wall-mounted boilers and three Inox-Maxi single-coil cylinders.

M&E contractor for was Floheat Services of Suffolk.

The Energator range of CHP units comprises six gas-fuelled models and six oil-fuelled models with electrical outputs up to 49 kW and heat up to 90 kW. The engines run at just 1500 rev/min and are hydraulically separated from the heating system.

For more information on this story, click here: September 2014, 103
Related links:
Related articles:



modbs tv logo

BCIA welcomes tougher commercial building energy standards but calls for greater ambition across the wider sector

The Building Controls Industry Association (BCIA) has welcomed the government’s confirmation that privately rented non-domestic buildings over 1,000 square metres in England and Wales will be expected to achieve a minimum EPC B rating by 2031, describing the move as an important step forward in improving the energy performance of the UK’s commercial building stock.

GOLDBECK commits to three-year schools partnership to inspire Cardiff’s future construction talent

GOLDBECK has launched a new long-term education initiative in Cardiff, committing to support three local primary schools as part of a programme designed to introduce young children to enterprise, careers and the wider world of construction.