Flakt Woods energy-efficient ventilation for uni

Flakt Woods. heat recovery, energy recovery, heat pump, thermal wheel, AHU, energy efficiency
Energy-efficient conditioning air is delivered to a VAV system by a Flakt Woods ReCooler unit in an eQ air-handling unit.

A reversible heat pump and a thermal wheel are key features of Flakt Woods ventilation system installed as part of the refurbishment of the Arundel Building at Sheffield Hallam University. The system can supply up to 2.5 m3/s of conditioning air into a VAV (variable air volume) system and incorporates inverter-driven compressors. It replaces a natural-ventilation system.

A ReCooler heat-pump unit is incorporated into an eQ air-handling unit instead of a separate wet heating coil or DX coil. This approach makes for a neat and tidy package that offers COPs much higher than the alternatives.

The ventilation system is designed so that each of the five floors is divided into six zones with ducting serving individual VAV boxes with temperature and CO2 control.

Lee Allen, senior building-services manager at the university, explains, ‘The refurbishment has been divided into two phases, with the installation of the ventilation system in phase one. From the outset, we decided to take a new approach, incorporating highly efficient mechanical-ventilation equipment alongside cross-flow ventilation with new opening windows. This has been designed to allow the centralised ventilation system to be optimised for mixed-mode conditions.’

The ReCooler HP unit provides heating and cooling from a built-in reversible heat pump and thermal wheel.

Russ Oliver, managing director of Flakt Woods, explains, ‘This installation is the first of two projects that we have carried out for Sheffield Hallam University that incorporates the ReCooler HP unit.’

For more information on this story, click here: April 2015, 91
Related links:
Related articles:



modbs tv logo

CIBSE team awarded BEIS contract for new guidance for large heat pump installations in non-domestic buildings

CIBSE are working with an authoring team from Arup and a cross-industry steering group on a contract awarded by BEIS to produce new guidance on the installation of heat pumps in larger non-residential buildings.

Supply chain issues still affecting construction output

Glenigan’s November Construction Index indicates continued decline, countering positive expectations of an autumn recovery