Eliminating pluming from condensing boilers

Glow-worm has tackled the problem of the vapour cloud that can surround the flue terminal from a condensing boiler with a kit that enables the flue outlet from a horizontal terminal to be raised by up to 6 m. It is based on 50 mm push-fit waste-pipe fittings. These kits can be used with all of the Glow-worm range of high-efficiency domestic heating boilers, and can be retro-fitted onto the standard horizontal flue terminal.
Related links:



modbs tv logo

Commercial landlords face MEES compliance crunch

Two-thirds of UK commercial real estate (CRE) owners admit they are “not fully compliant” with energy efficiency regulations, according to new research from smart buildings specialist LMG. 

Recognising outstanding achievements at CIBSE Building Performance Awards 2025

The Park Plaza Westminster Bridge in London came alive on 27th February 2025 for the prestigious CIBSE Building Performance Awards.