KalGuard limescale preventer in 22 mm size

pipe, pipework, pipe services, Kalguard, limescale

Commercial now offers its KalGuard system for preventing limescale formation as a 22 mm package suitable for most small commercial buildings. It includes a zinc anode unit, water meter and controller that is set to a 22 mm commissioning mode to create a true plug-and-play solution.

KalGuard permanently conditions water by dosing it with a very low level of stable zinc via an electrolytic process. Calcium-carbonate crystals form as aragonite, which does not form a deposit, rather than a deposit-forming calcite (limescale).

The system is recommended by the UK building-services compliance guide to Part L. Independent tests at Cranfield University have shown its ability to reduce limescale significantly.

For more information on this story, click here: October 2015, 86
Related links:
Related articles:



modbs tv logo

LG supports fast-moving WeWork project

How LG Air Conditioning helped WeWork London achieve a fast project with great results.

Competency - achieving it and proving it

BESA training director Tony Howard explains why proving competency is going to be so crucial in 2020 and how he thinks it could work.

Calendar