Lochinvar goes Aloft to meet peak DHW demand

Lochinvar, DHW, hot water

Lochinvar has supplied three EcoShield high-efficiency water heaters as part of the refurbishment of one of Liverpool’s most iconic buildings to create the Aloft Hotel. The Grade 2 listed Royal Insurance Building had been disused for over 20 years; The original neo-baroque building dates back to 1896.

The outcome of the project is an ultra-modern hotel in an iconic and historic shell that retains many of its original features.

There are 116 ‘loft-like’ rooms. All are equipped with walk-in showers, which at peak times place considerable demand on the hot-water supply. Lochinvar worked closely with Liverpool-based contractor HE Simm to select equipment to meet the needs.

The three EcoShield water heaters can supply up to 6000 l/h of hot water. Each heater can store 425 l, and their fast-recovery performance means they can respond quickly at times of heavy demand.

Their compact size for their output was a key consideration. Condensing technology reduces energy costs, and the burner can modulate down to 20% of full output.

For more information on this story, click here: January 2016, 130
Related links:
Related articles:



modbs tv logo

Four new appointments at BCIA

THE Building Controls Industry Association (BCIA) has appointed a new Vice-President and three new additions to its Management Committee.

Engineering services alliance welcomes retentions reporting legislation

Engineering services alliance Actuate UK has warmly welcomed the new secondary legislation which will require reporting of cash retentions held by the large construction companies under the Reporting Regulations.