Geberit helps stately home go green

Geberit, pipe, pipework, press fit, press fitting

To avoid hot works during the installation of a biomass heating system at Saltram House, a stately home in Plymouth owned by the National Trust, Geberit’s Mapress carbon-steel system was chosen. Another benefit was its ease of installation. The two boilers supply the district-heating system which provides heating and hot water to the main house and most other buildings on the site.

There are two biomass boiler, rated at 220 kW and 95 kW. They are fuelled by pellets.

‘We use Geberit Mapress on 95% of our jobs,’ said James Howard, from Dunster Biomass, which installed the system.

‘At Saltram House, the biomass system had to be installed within the confines of the existing building and its heating system, while ensuring that it could be easily removed if required. Faced with narrow doorways and cramped spaces, Geberit Mapress was the ideal solution.

‘The age of the building and cramped environment also meant that hot work was just not an option because of the fire risk. Geberit Mapress and its press-fit assembly is particularly well-suited to jobs of this nature.’

For more information on this story, click here: August 2016, 129
Related links:
Related articles:



modbs tv logo

Commercial landlords face MEES compliance crunch

Two-thirds of UK commercial real estate (CRE) owners admit they are “not fully compliant” with energy efficiency regulations, according to new research from smart buildings specialist LMG. 

Recognising outstanding achievements at CIBSE Building Performance Awards 2025

The Park Plaza Westminster Bridge in London came alive on 27th February 2025 for the prestigious CIBSE Building Performance Awards.