Making light work of installing lighting

Flexconnectors
A flexible and energy-saving lighting installation in new premises for Matthew Boulton College in Birmingham has been achieved using products from Flex Connectors.
Lighting connection and control products, extra-low-voltage switching, connection units and prefabricated chains of sockets from Flex Connectors have been used on all nine floors of the new £40 million premises of Matthew Boulton College in Birmingham. The building includes classrooms, meeting rooms, a library and an operating theatre. It enables the college to expand its healthcare, medical and IT facilities. Contractor Interserve Engineering Services chose the Flex 7 range as an energy-saving solution that is adaptable enough to accommodate complex installation requirements, including combining occupancy sensing with options for over-ride switching. The project also uses Flexishield pre-wired conduit instead of standard flexible metal conduit.
Related links:



modbs tv logo

HS2 Code of Practice is good news for JIB members

High Speed Two Limited (HS2 Ltd) has released its Employee and Industrial Relations (EIR) Code of Practice (the Code), which brings significant advantages to Joint Industry Board (JIB) member companies looking to work on one of the most demanding and exciting transport projects in Europe.

Industry leaders gather at CIBSE’s Measuring Performance and Facilities Management conference

CIBSE’s Measuring Performance and Facilities Management conference recently brought together leading voices from across the built environment
to explore the evolving landscape of building performance and operational excellence.