MHG supplies heat and water in packaged solution

MHG Gassero, Exeter College

MHG Gassero has supplied three Superbox gas-fired condensing boilers to Exeter College to provide space heating and hot water at the college’s Laurence Building. The 2 x 1MW and 1 x 500kW Superbox boilers, were installed in a packaged plant room that was delivered to site in two halves.

The Superbox boilers integrate with the college’s BMS and have a turndown from 2,500kW to 37kW across the three boilers. This ensures excellent load matching and optimum efficiency.

The new packaged plant room is located alongside an existing packaged unit which will become redundant once the changeover of services is completed by Mitie Building Services of Exeter. The new plant room was designed and specified by Hoare Lea of Plymouth and manufactured by Packaged Plant Solutions of Milton Keynes.

For more information on this story, click here: March 2018, 122
Related links:



modbs tv logo

CHAS urges construction industry to embrace Common Assessment Standard following data sharing agreement roll out

CHAS was the first Recognised Assessment Body to offer the Common Assessment Standard which has fast become the industry’s gold standard for pre-qualification. 

R&D spending in construction sector rose 7.9% last year, despite the pandemic

Construction sector R&D spending hit £368m last year, according to latest ONS data

Calendar