MHG supplies heat and water in packaged solution

MHG Gassero, Exeter College

MHG Gassero has supplied three Superbox gas-fired condensing boilers to Exeter College to provide space heating and hot water at the college’s Laurence Building. The 2 x 1MW and 1 x 500kW Superbox boilers, were installed in a packaged plant room that was delivered to site in two halves.

The Superbox boilers integrate with the college’s BMS and have a turndown from 2,500kW to 37kW across the three boilers. This ensures excellent load matching and optimum efficiency.

The new packaged plant room is located alongside an existing packaged unit which will become redundant once the changeover of services is completed by Mitie Building Services of Exeter. The new plant room was designed and specified by Hoare Lea of Plymouth and manufactured by Packaged Plant Solutions of Milton Keynes.

For more information on this story, click here: March 2018, 122
Related links:



modbs tv logo

Baxi survey reveals care home leaders need support to achieve heat decarbonisation goals

Baxi recently surveyed over 400 senior and middle management care home managers in both the private and public sector this summer in an effort to understand the enablers required to help decarbonise the sector.

CIBSE launches Society of Vertical Transportation to elevate standards worldwide

CIBSE has officially launched the Society of Vertical Transportation (SoVT), an international professional community for individuals and organisations working across the design, engineering, installation and innovation of lifts, escalators and emerging vertical mobility systems.