Ecoflam burners in action

anaerobic heating, Ecoflam burners

Ecoflam has supplied one of its 350kW Max Gas gas burners as part of the refurbishment of an anaerobic heating system. The system is based at Channing and Sons farm in Coventry. Unfortunately, the original burner failed and was difficult to maintain. Experts Ryla Combustion recommended the Ecoflam Max Gas product due to its efficiency and ease of installation.

To make maintenance easy, the MAX GAS has a single bolt burner fixing with the capability to firmly secure it to the flange in three fixing points. Plus, the hinge flange allows access to the burner head without losing burner settings. Additional features include an air damper with progressive micrometric air regulation, easy to assemble combustion head and a separate gas train.

The MAX GAS burner range utilises standard components from industry leaders, making it exceptionally easy to obtain spare parts.

For more information on this story, click here: October 2018, 127
Related links:



modbs tv logo

Heat network confidence outpaces progress in social housing

Baxi surveyed 100 housing associations and 102 local authorities and councils responsible for managing or operating heat networks this summer, alongside in-depth interviews with five housing associations, a heat network consultant and heat network contractor.

Signify showcases F1 lighting partnership at Brackley campus

MBS Features Editor Russell Drury was among a group of journalists from across Europe invited to visit the Mercedes-AMG PETRONAS Formula One Team’s headquarters in Brackley, where Signify showcased its partnership with the team and the shared focus on innovation and sustainability.