Ecoflam burners in action

anaerobic heating, Ecoflam burners

Ecoflam has supplied one of its 350kW Max Gas gas burners as part of the refurbishment of an anaerobic heating system. The system is based at Channing and Sons farm in Coventry. Unfortunately, the original burner failed and was difficult to maintain. Experts Ryla Combustion recommended the Ecoflam Max Gas product due to its efficiency and ease of installation.

To make maintenance easy, the MAX GAS has a single bolt burner fixing with the capability to firmly secure it to the flange in three fixing points. Plus, the hinge flange allows access to the burner head without losing burner settings. Additional features include an air damper with progressive micrometric air regulation, easy to assemble combustion head and a separate gas train.

The MAX GAS burner range utilises standard components from industry leaders, making it exceptionally easy to obtain spare parts.

For more information on this story, click here: October 2018, 127
Related links:



modbs tv logo

More refrigerant bans possible, says government

The government could tighten up the rules that restrict the use of global warming refrigerant gases including speeding up phase-out programmes and introducing new bans, according to a spokesman from the Department for Environment, Food and Rural Affairs (DEFRA).

Baxi research suggests schools strongly support heat decarbonisation

A survey conducted by Baxi of 200 state school estates managers, consultant engineers and M&E contractors has found that while enthusiasm for Net Zero and support for low carbon heating systems in schools is thriving, persistent barriers remain.