Pump House in East Grinstead

Pump House

A new 79-bedroom Travelodge Hotel has opened on the Little King Street site in East Grinstead.

It was part of a wider local £.6.6 million redevelopment. The site is a former Caffyns showroom.

Pump House was asked to support a very heavy rooftop water tank at the above project, where the tank was of considerable weight. The operating weight of the tank, (including contents - water) was nearly 13,000kg.

By using secondary steelwork combined with its Flexi-heavy – Flexi Quad support frameworks, Pump House managed the very demanding imposed loads, uniformly back down through each foot in-turn.

This resulted in low foot pressures exerted onto the waterproofing system beneath, to keep within the roof insulation boards permissible compressive strength limitations.

All frameworks are fully height adjustable, via the M24 adjuster legs to compensate flat roof falls, and steelwork is hot dip galvanised for durability, to BS EN ISO 1461:2009.

For more information on this story, click here: October 2018, 125
Related links:
Related articles:



modbs tv logo

ICOM celebrates Noah Gaunt as Apprentice of the Year 2026

Noah Gaunt of Vaillant Group UK has been named ICOM’s Apprentice of the Year 2026, recognising his outstanding commitment, technical excellence and passion for advancing the future of low carbon heating.

BCIA warns non-domestic buildings risk being overlooked despite decarbonisation drive

Commercial and public buildings risk being left behind in the UK’s transition to Net Zero despite more than £40 billion of funding, investment and policy support being directed towards building decarbonisation, according to the latest Policy Pulse report from the Building Controls Industry Association (BCIA).