Dual-tapped boilers match DHW and heating needs

Keston
Featuring two pairs of flow and return tappings capable of providing different flow temperatures, these Keston wall-hung condensing boilers provide an effective means of meeting the DHW and heating requirements of a community centre in Eastbourne.
The conversion of a carpet warehouse in Eastbourne to a community centre is one of the first installations of Keston’s recently launched C90/C110 wall-mounted, modulating gas-fired commercial condensing boilers. Three C90 boilers were specified for the Kings Church Community Centre, which is used by a variety of organisations from children’s playgroups to indoor sports. The boilers supply hot water and radiators, plus three air-handling units. These boilers are unusual in providing two pairs of flow and return tappings for separate connection to heating and hot-water circuits, enabling them to deliver two different flow temperatures at the same time for fast recovery of DHW and a lower temperature for space heating. This combined ability reduces the amount of pipework and controls required. info@keston.co.uk www.keston.co.uk
Related links:
Related articles:



modbs tv logo

Fujitsu General Air Conditioning becomes GENERAL HVAC Solutions UK

Fujitsu General Air Conditioning (UK) has become GENERAL HVAC Solutions UK from 1st January 2026, strengthening its long-term position within the global Paloma Rheem Holdings (PRH) group.

Market performance indicates encouraging signs for future of BEMS sector

Highlighting an increased desire from property developers, architects and designers to decarbonise the UK’s building stock through the specification and implementation of building controls and automation, the building energy management systems (BEMS) market showed steady progress in Q3 – rising 2.6% compared to the previous quarter.