Swimming-pool refurbishment gives year-round use

Swimming pool
A new enclosure and heating system from Nordair/Niche enables this swimming pool in Maidenhead to be used all year round.
A new heating system from Nordair/Niche now enables Claire’s Court School in Maidenhead to use its swimming pool all year round, maintaining its competitive edge against local rivals. The 18x7 m pool was enclosed by a Perspex structure but could not be used in the winter because of condensation building up in the roof and uncomfortably low temperatures. Refurbishment work involved replacing the 40-year-old dome cover with an aluminium-framed polycarbonate pool enclosure from Arqualand and installing heating. A Niche gas-fired LSD350 unit heater with an output of 103 kW was mounted externally. It delivers warm air via a louvred grille at a velocity to ensure even heat distribution.
Related links:



modbs tv logo

Government must do more to tackle heat pump and electric vehicle barriers, Which? says

Which? is calling on the government to provide more support for greener home heating and cars, as new research shows cost and other barriers are putting people off making the switch.

New study reveals job stress affects 70% of construction workers

A groundbreaking study conducted by researchers from the University of Cambridge has revealed that at least 70% of people in the construction industry report feeling stressed at work, and this not only has a negative impact on job performance but also personal life. The findings highlight the urgent need for effective strategies to combat workplace stress.