Swimming-pool refurbishment gives year-round use

Swimming pool
A new enclosure and heating system from Nordair/Niche enables this swimming pool in Maidenhead to be used all year round.
A new heating system from Nordair/Niche now enables Claire’s Court School in Maidenhead to use its swimming pool all year round, maintaining its competitive edge against local rivals. The 18x7 m pool was enclosed by a Perspex structure but could not be used in the winter because of condensation building up in the roof and uncomfortably low temperatures. Refurbishment work involved replacing the 40-year-old dome cover with an aluminium-framed polycarbonate pool enclosure from Arqualand and installing heating. A Niche gas-fired LSD350 unit heater with an output of 103 kW was mounted externally. It delivers warm air via a louvred grille at a velocity to ensure even heat distribution.
Related links:



modbs tv logo

Four new appointments at BCIA

THE Building Controls Industry Association (BCIA) has appointed a new Vice-President and three new additions to its Management Committee.

Engineering services alliance welcomes retentions reporting legislation

Engineering services alliance Actuate UK has warmly welcomed the new secondary legislation which will require reporting of cash retentions held by the large construction companies under the Reporting Regulations.