ICS makes it five

ICS
Control systems for five major buildings in this development at Feltham are being designed and installed by Integrated Control Systems in a £100 000 contract.
Five buildings in Longford Centre development being built at Feltham in Middlesex are having control systems installed by Integrated Control Systems in a £100 000 contract. The stand-alone systems are being installed in a 20 400 m2 medical centre, 1670 m2 library, management suite, 115-bed hotel and retail store that serve 800 apartments and homes. The contract was awarded by Rosser & Russell Building Services. ICS is installing systems to control air-handling units, hot-water systems, extract fans, VAV systems, boilers and pumps. ICS is also building a motor-control panel with BMS controls for each building. The project includes the control of an extensive fire-alarm system in the medical centre.
Related links:



modbs tv logo

Carrier calls for prioritisation of ventilation in NHS infrastructure plans

As the healthcare sector begins
to plan how new government infrastructure funding will be spent, Carrier is urging NHS estates teams to prioritise ventilation upgrades as part of long-term building improvement strategies.

Specifiers urged to act ahead of looming legislation

Specifiers are being encouraged to switch to efficient secondary hot water circulators ahead of anticipated legislation that will ban inefficient versions of these domestic and commercial plumbing products.