Grundfos powers fire safety at Emirates Stadium

arsenal
Opened by Prince Philip at the end of October, the Emirates Stadium has a bespoke fire system designed by Grundfos Pumps.
The fire-safety system for the 60 000-seat Emirates Stadium of Arsenal Football Club is based on a bespoke solution designed by Grundfos Pumps. It comprises a diesel/electric fire sprinkler pump system and a hose-reel packaged set. It was commissioned and installed in partnership with Hall & Kay Fire Engineering of Windsor. The hose-reel set incorporates Grundfos CRI multi-stage centrifugal pumps.
Related links:



modbs tv logo

BEMS market shows promising performance upturn

Highlighting a determination from building owners to reduce energy consumption through technology, the building energy management systems (BEMS) market saw a 1.4% quarter-on- quarter increase in Q4 2024 – according to the Building Controls Industry Association’s (BCIA) latest market report.

Construction Carbon and CIBSE collaborate to provide environmental skills training

Construction Carbon, in collaboration with CIBSE, has announced the development of the Lifecycle Carbon Assessor Practitioner Training programme.