Pre-insulated ducting shows its paces in hospital project

ductwork
The ability of Kingspan’s KoolDuct pre-insulated ducting system to be installed up to three times faster than sheet-metal ductwork has been exploited in the new £4.5 million hospital sterilisation and decontamination unit for Hull & East Yorkshire Hospitals NHS Trust. 1400 m2 of KoolDuct was specified by consulting engineers Hoare Lea and installed by Solitaire Ventilation Management. The sterile-services unit is being moved from Castle Hill Hospital to Hessle Road in Hull as part of the £150 million improvement programme at the Castle Hill site to make way for new cardiac and surgical facilities. Another benefit of Koolduct for this project is that ventilation air flows over aluminium surfaces and does not have contact with material containing loose fibres. Steve Weston of Hoare Lea says, ‘The ease and speed with which KoolDuct can be installed and the convenience of manufacturing the system on site made it the ideal form of ducting for this project as time was of the essence.’ The KoolDuct system requires only a single-fix installation, compared with traditional sheet-metal ducting which needs to be vapour sealed and thermally insulated as a second operation.
Related links:



modbs tv logo

HS2 Code of Practice is good news for JIB members

High Speed Two Limited (HS2 Ltd) has released its Employee and Industrial Relations (EIR) Code of Practice (the Code), which brings significant advantages to Joint Industry Board (JIB) member companies looking to work on one of the most demanding and exciting transport projects in Europe.

Industry leaders gather at CIBSE’s Measuring Performance and Facilities Management conference

CIBSE’s Measuring Performance and Facilities Management conference recently brought together leading voices from across the built environment
to explore the evolving landscape of building performance and operational excellence.